TOP RUNNING CRANE INFORMATION
Form F00116 Revised 11-4-04
|
Job (Quote) No. : |
|
|
Page |
_____ of _____ |
|
Builder/Customer: |
|
|
Date: |
|
DESCRIPTION
*Required Information for Quote
* Number of cranes per runway: __________ Minimum distance between cranes: _______ Feet
* Capacity: Main Hoist _____________ Tons Auxiliary Hoist ________________________ Tons
Hoist and Trolley Weight __________ Lbs. Bridge Weight: ________________________ Lbs.
Wheel Base ____________________ Feet Max. Wheel Load (no impact) ____________ Lbs.
Hoist: Geared Electric Trolley: Geared Electric
Control Location: Pendant Cab Runway Beams: By MBM Not By MBM
Brackets: By MBM Not By MBM *Type: Monorail Single Girder Dbl. Girder
Rail: By MBM Not By MBM ASCE Rail Size: ________ Lbs./Yd.
Length of Runway: _________ Feet CMAA Class: ____ (See Sht. ____ of ____ )
Manufacturer: ________________ See Attached Mfg. Info. Sheet Assume Kranco Mfg.
Notes:
(E) Unless noted otherwise, Metal Building Manufacturer will anchor ASCE rails by means of hook bolts.
(F) Electrical conductor supports are to be furnished by the electrical contractor.
(G) Metal Building Manufacturer will determine method of supporting crane beams unless specific requirements are indicated.
(H) With two or more cranes in a building, Metal Building Manufacturer, unless otherwise specified, will design building and runway beams assuming multiple cranes acting at one time on any runway beam span or any one frame.
(I) Some Cranes may require Hammerhead or separate columns.
(J) Crane loads and other crane data varies between crane manufacturers. These variations can affect the design and economy of a crane building. Significant economic benefit may be achieved if the crane manufacturer is selected prior to the design of the building. This provides the metal building manufacturer with specific crane data for design of the building.